Skip to content

Aviation document control

Control the distribution, not just the library.

Document control keeps the right revision approved and filed. It doesn’t prove that the people who work to that revision have read it. SkySign does that part, and is clear about the parts it leaves to your document control system.

Book an aviation demoTake the product tour

SkySign product tour

Interactive walkthrough · 7 steps · about a minute

Start free trial

See how SkySign distributes, tracks and proves operational briefings in 20 minutes.

SkySign · Documents
Search documents...
Upload

Upload a PDF procedure

Choose a file to issue to staff

NameStatusSizeUploaded
Safety Manual 2026
active2.4 MBJan 15, 2026
Ground Handling SOP
active1.8 MBJan 10, 2026
Emergency Procedures
active3.1 MBDec 22, 2025
Ramp Safety Policy
inactive1.2 MBNov 30, 2025
PPE Requirements 2025
active0.9 MBNov 15, 2025
Illustration: The documents list, with sample data.

Straight answer

What SkySign does and doesn’t do for document control.

What SkySign does

  • Issues the approved file to the departments, station groups or people who must read it.
  • Fingerprints the file with SHA-256 when it is issued, and stores that fingerprint with every acknowledgement.
  • Shows, for each document, who has and hasn’t acknowledged it.
  • Lets you deactivate a superseded document so it stops asking for acknowledgement.

What it doesn’t do

  • Keep revision history or compare revisions.
  • Run review and approval workflows.
  • Check documents in and out, or manage controlled copies.
  • Replace your master document library.

Working together

Your library approves it. SkySign proves it was read.

  1. 1
    Step 1

    Approve in your system

    Review, approve and file the revision as you do today.
  2. 2
    Step 2

    Issue the approved PDF

    Upload it with the revision in the title, such as “GOM 4.2 Pushback, Rev 14”, and choose read-and-comply wording.
  3. 3
    Step 3

    Collect acknowledgements

    Staff in the chosen groups are emailed, and completion builds group by group.
  4. 4
    Step 4

    Retire the old revision

    Deactivate the previous document. Its records stay available to administrators.

Proving the revision

How to show which revision someone acknowledged.

Evidence that ties an acknowledgement to a revision
EvidenceWhere it comes from
Document titleInclude the revision number when you issue, so it appears on every record and export.
SHA-256 fingerprintTaken from the file at issue. Compute the fingerprint of your controlled PDF to show the two match.
Acknowledgement timeThe server timestamp shows the revision was acknowledged while it was current.

Worth knowing

  • Revision numbers live in the document title; SkySign doesn’t track them separately.
  • Editing an issued document doesn’t ask anyone to acknowledge again. Issue a changed procedure as a new document.
  • Deactivated documents disappear from staff lists, including their history. Administrators keep the records.

Questions

Frequently asked questions

Does SkySign keep revision history?

No. Keep revisions in your document control system, and issue each approved revision in SkySign as a new document.

Can SkySign hold our controlled manuals?

It keeps every file you issue in private storage, but it isn’t designed as a controlled library: there are no folders, approval steps or check-out. Keep the master copy in your library.

How do we prove someone read the current revision?

Put the revision number in the title, keep the document’s fingerprint, and show that the acknowledgement time falls while that revision was in force.

What happens to acknowledgements when we deactivate the old revision?

They stay on record for administrators and in exports. Staff no longer see the document.

Keep your library. Add the proof.

We’ll show an approved revision issued from your process and acknowledged by the people who use it.

See how SkySign distributes, tracks and proves operational briefings in 20 minutes.

Book an aviation demoTake the product tour

SkySign product tour

Interactive walkthrough · 7 steps · about a minute

Start free trial